36 / JULY.AUGUST.2020 USICERINKS.COM , We allowed the paint to dry/cure for two weeks before we packed the sand back in. We did have to add a few small bags of sand to replace the contaminated sand we removed. The sand was leveled and re-saturated for the ice install process. IN THE TRENCHES