Rink

March/April 2021

Issue link: http://read.uberflip.com/i/1350211

Contents of this Issue

Navigation

Page 30 of 47

.S. USICERINKS.COM MARCH.APRIL.2021 / 31 // What types of things needed to be taken into consideration in prep for this? There were so many scheduling and logistical factors to consider. Practice and game schedules were criti- cal in identifying when and how many ice resurfaces needed to be performed on a daily basis. The schedule gave us the roadmap for staffing and equipment needs as well. Ice thickness was a critical discussion point to maintain a safe field of play that could hold up to the number of games and practices throughout the pod. , Meticulous scheduling and reporting was crucial to maintaining premium ice conditions.

Articles in this issue

Links on this page

Archives of this issue

view archives of Rink - March/April 2021