Issue link: http://read.uberflip.com/i/1504285
USICERINKS.COM JULY.AUGUST.2023 / 43 ABOVE: Insulation on the left; welding rink floor piping on the right. ABOVE RIGHT: Cutting the last pieces of insulation under the rink floor. RIGHT: The supply and return headers at center ice.