Vinh Tan 2 coal Fired Power Plant
aurecon is providing project
management and technical services for
the Vinh tan 2 coal-fired power plant.
located on the coast, 250 km
northeast of Ho Chi minh City, the plant
will have a capacity of 1 200 mW and is
due to be commissioned in 2014.
hanoi international Airport
Terminal 2
Hanoi, Vietnam
aurecon was engaged to provide
the structural and geotechnical
engineering for terminal 2. the four
storey, 138 000 square metre terminal
includes two 400 metre concourses, 14
fixed link bridges, an elevated approach
road and ancillary buildings.
Waterpoint Township
Waterpoint, Vietnam
the township is a 359 hectare, mixed use
township development to be developed
over the next 20 to 30 years. it will
house 25 000 residents in a mix of villas,
town houses and apartments and will
be supported by education facilities,
including a university, a range of retail and
commercial facilities and a possible marina.
Vietnam
Return
to map