USMX Animated PDFs

2017 USMX ANNUAL REPORT

Issue link: http://read.uberflip.com/i/993758

Contents of this Issue

Navigation

Page 54 of 79

51 USMX PORT ASSOCIATION MEMBERS LOCAL NEGOTIATIONS The Terminal Advance Gate System or AGS has been implemented at both the Wando Terminal and North Charleston Terminal. Longshoremen • Ken Riley was re-elected President of ILA Longshore Local 1422. • ILA Longshore Local 1422 has pulled out of the South Atlantic Negotiating Committee and will seek to bargain independently of Wilmington, NC, Savannah, GA, Jacksonville, FL and Tampa, FL for their own District Contract. SC Inland Port The South Carolina Inland Port, located in Greer, SC, has been in operation since 2013. A Second Inland Port project has been proceeding and is scheduled to open in Dillon, SC, in April 2018. Exis ng Terminal Moderniza on and Infrastructure Projects • The last phase (Berth 3) of the Wando Welch Terminal (WWT) strengthening project is scheduled for completion by the end of June 2018. • Two new neo-Panamax cranes with a 155-foot lift height are scheduled for delivery in April 2018. One of the existing cranes has been raised and is back in service. A second crane is in the process of being raised and this project will continue until all cranes at the WWT are completed.

Articles in this issue

view archives of USMX Animated PDFs - 2017 USMX ANNUAL REPORT