34 / NOVEMBER.DECEMBER.2021 USICERINKS.COM
5: New supply and return headers
along with new insulation.
6-8: New rink refrigeration piping
and return bends.
9: New concrete floor being
poured.
10: New condenser being installed.
11: New Bitzer screw compressor
package being installed.
12: New motor control center
being installed.
13: New refrigeration machinery
room up and running.
14: Ice install with the new
refrigeration system.
PHOTOS: ANOKA AREA ICE ASSOCIATION