34 / NOVEMBER.DECEMBER.2021 USICERINKS.COM 5: New supply and return headers along with new insulation. 6-8: New rink refrigeration piping and return bends. 9: New concrete floor being poured. 10: New condenser being installed. 11: New Bitzer screw compressor package being installed. 12: New motor control center being installed. 13: New refrigeration machinery room up and running. 14: Ice install with the new refrigeration system. PHOTOS: ANOKA AREA ICE ASSOCIATION REFRIGERATION REPLACEMENT [ A P R O J E C T I N P I C T U R E S ] 9 7 8 5 6 10 11 12 13 14