LoRa Alliance
5177 Brandin Court,
Fremont, CA 94538 USA
LoRaWAN 1.0.4 End Device Certification Page 163 of 173
Requirements for All Regions Version 1.4
Copyright © 2021 LoRa Alliance, Inc. All rights reserved. www.lora-alliance.org
Step Procedure Message Sequence Test
Purpose
End
Device
- TCL
Message
1 DUT sends Unconfirmed frame
→
The TCL sends Unconfirmed frame
CP-CMD
DutFPort224DisableReq
FPort = 224
Payload = [0x]07E
Disable the
FPort 224 for
the DUT as
the last step
of the Test
cycle
2 If the device is an OTAA device, DUT
sends Join-Request frame
Else, skip to the next step
→
If the device is an OTAA device, TCL
sends Join-Accept response
Join
accepted for
OTAA
device
3 DUT sends Unconfirmed or Confirmed
frame
→
FPort = any allowed port
except 224
The TCL sends Unconfirmed frame
CP-CMD
TxPeriodicityChangeReq
FPort = 224
Periodicity = 5 sec
Payload = [0x]0601
If DUT sent Confirmed uplink
frame, TCL must
Acknowledge
Try to set
Uplink
Periodicity
4 DUT sends Unconfirmed or Confirmed
frame
If this uplink is not received within 2
minutes, then the test can be ended, and
the next steps can be skipped.
→
The TCL sends Unconfirmed frame
CP-CMD EchoPayloadReq
FPort 224
Payload = [0x]08010203
If DUT sent Confirmed uplink
frame, TCL must
Acknowledge
5 Wait for a maximum of 3 minutes for the
DUT to send an Unconfirmed or
Confirmed frame
If no uplink is sent, the test can be ended,
and the next steps can be skipped.
→
No EchoPayloadAns
response received
FPort 224
downlinks
are not
accepted.
The TCL sends Unconfirmed frame
CP-CMD EchoPayloadReq
FPort 224
Payload = [0x]08010203
If DUT sent Confirmed uplink
frame, TCL must
Acknowledge
Repeat the
EchoPayloa
dReq