PDF

LeCheng Energy Case Study

Issue link: https://read.uberflip.com/i/1492936

Contents of this Issue

Navigation

Page 0 of 1

www.sketchup.com Shenyang Urban Waste Industrial Recycling Park A father-daughter duo transformed a failed industrial park plan into a multi-patented project that secured $244M USD in funding for their client. Similar projects typically take six to twelve months to design. However by using SketchUp from end-to-end, the duo completed the design in a month, doubling the factory's production capacity in the process. Full case study here. Location: Shenyang, China Project type: Industrial Park Status: Completed Project Cost: $244M USD Project Area: 510,000m 2 GFA LeCheng Energy

Articles in this issue

Links on this page

view archives of PDF - LeCheng Energy Case Study