Document

Regulatory Approvals in APAC

Issue link: https://read.uberflip.com/i/1509534

Contents of this Issue

Navigation

Page 11 of 16

LoRaWAN ® LIVE 12 Country Certification of LoRaWAN ® Devices Malaysia ▪ Authority: Standards and Industrial Research Institute of Malaysia (SIRIM) ▪ Local RF approval: needed ▪ Bands: 433-435 MHz and 919-923 MHz ▪ Lead time: 4 weeks* ▪ EN or FCC reports can be leveraged, but normally due to the reports not matching the above frequency band, local tests are required. ▪ Local rep: Needed. Actual importer

Articles in this issue

Links on this page

view archives of Document - Regulatory Approvals in APAC