White Paper

Buy versus build: A faster, lower-risk path to implementing your program’s ATO technical controls

Issue link: https://read.uberflip.com/i/1545918

Contents of this Issue

Navigation

Page 3 of 3

WHITE PAPER Buy vs. Build: A Faster Path to ATO mrcy.com 4 Learn more Visit: mrcy.com Contact us The Mercury Systems logo is a registered trademark of Mercury Systems, Inc. Other marks used herein may be trademarks or registered trademarks of their respective holders. Mercury products identified in this document conform with the specifications and standards described herein. Conformance to any such standards is based solely on Mercury 's internal processes and methods. The information contained in this document is subject to change at any time without notice. © 2026 Mercury Systems, Inc. 8226.00E-0726-wp-RelianceRMF MADE IN USA Corporate Headquarters 50 Minuteman Road Andover, MA 01810 USA +1 978.967.1401 tel +1 866.627.6951 tel +1 978.256.3599 fax EMEA Headquarters Avenue Eugène-Lance, 38 PO Box 584 CH-1212 Grand-Lancy 1 Geneva, Switzerland +41 22 884 51 00 tel LOWER COST. LOWER RISK. FASTER TO AUTHORIZATION. Building this capability internally means paying for it twice: once in engineering hours to build it, and again in sustainment hours to keep it current against new threats, new RHEL releases, and new findings. That cost grows the deeper a custom build goes into hardening, encryption, and ongoing patch validation — and it's billed by the hour for as long as the system is fielded. RelianceOne replaces that open-ended commitment with a single, predictable acquisition that is priced and delivered as a product, not an engineering services contract. Programs get a known cost, schedule and scope, backed by a solution that has already passed government evaluation and is already running in fielded, mission-critical systems. SEE HOW RELIANCEONE MAPS TO YOUR SPECIFIC CONTROL BASELINE. Request a tailored coverage assessment for your program's system boundary and current control baseline — we'll show you exactly which of your technical controls are already addressed.

Articles in this issue

Links on this page

view archives of White Paper - Buy versus build: A faster, lower-risk path to implementing your program’s ATO technical controls