Rink

January/February 2020

Issue link: http://read.uberflip.com/i/1199871

Contents of this Issue

Navigation

Page 50 of 55

USICERINKS.COM JANUARY.FEBRUARY.2020 / 51 EXPERIENCE solutions that make a di erence htg-architects.com Brian Teeters President at Engelsma Construction, Inc. "HTG and Engelsma have had a great relationship on past projects. Our teams have worked well together, and we have a successful track record. On our rst multipurpose facility together, HTG was instrumental to the whole process but that is to be expected with their long resume of successful multipurpose projects." Visit Level-Ice at www.Level-Ice.com or Call (519) 235-4585 WE BRING YOUR ICE TO A NEW LEVEL Laser Leveled Ice surface gives the operator: • Known depths of lines and logos • Less hot water consumption • Save on compressor run time • More consistent ice surface • Less on ice maintenance • Less operator error So bring laser leveling into your rink for a consistent, Level-Ice surface...Everytime

Articles in this issue

Links on this page

Archives of this issue

view archives of Rink - January/February 2020