36 / JULY.AUGUST.2020 USICERINKS.COM
,
We allowed the paint to dry/cure
for two weeks before we packed the
sand back in. We did have to add a
few small bags of sand to replace the
contaminated sand we removed. The
sand was leveled and re-saturated for
the ice install process.
IN THE
TRENCHES