Rink

July/August 2020

Issue link: https://read.uberflip.com/i/1268579

Contents of this Issue

Navigation

Page 31 of 55

32 / JULY.AUGUST.2020 USICERINKS.COM IN THE Project in Pictures: Sand floor header leak and end loop repair and preventative maintenance project // by CRAIG PETERSEN, CIRM TRENCHES , Photos after contaminated sand was removed and all header connections were exposed. All pipe clamps were inspected and tightened.

Articles in this issue

Links on this page

Archives of this issue

view archives of Rink - July/August 2020